Boards and lanes
Hierarchy
Section titled “Hierarchy”Workspace└─ Board └─ Lane └─ Task (can have subtasks through parent–child links)Boards
Section titled “Boards”A board is where your task cards live. Use Switch board in the header to add, switch, or rename boards.
In the sidebar, you can organize boards into groups, rename groups, pin boards, and drag boards between groups. Pin frequently used boards to keep them near the top.
Archived boards disappear from the list. You cannot archive the last active board, because the workspace must keep at least one board.
A lane represents a stage of work. New boards have three system lanes.
| Lane | Type | Purpose |
|---|---|---|
| TODO | System | Not started |
| DOING | System | In progress |
| DONE | System | Completed |
System lanes cannot be renamed. Completion tracking, analytics, and MCP filters rely on these distinctions. You can change their colors and order.
Lane actions
Section titled “Lane actions”- Add: Choose Add lane near the lane headers, enter a name, and press Enter.
- Reorder: Drag the lane header.
- Change color: Open the lane header menu.
- Archive all: Archive the cards in that lane together.
- Delete: Remove the lane. Its tasks move to the first lane.
Design lanes around waiting
Section titled “Design lanes around waiting”Add lanes for stages where work waits: review, confirmation, approval, or release. A separate lane shows where work is piling up and how many tasks are waiting.
Do not create a lane for each person. Tasks already have assignees, and the header filters can select them.
The reasoning is also in Design your boards and lanes.
Switch views
Section titled “Switch views”Boards offer several views:
- Kanban: Cards grouped by lane
- Timeline: Scheduled start dates and due dates on a time axis
- Flow: Parent–child relationships and connections between tasks
See a project’s schedule on the timeline
Section titled “See a project’s schedule on the timeline”Open Timeline and select a project. This example uses Help Center Launch, with scheduled start dates and due dates set on its tasks.
The date spacing is set to Wide. The dates are sample data for the screenshots.
Use Kanban to see each task’s stage, then Timeline to check overlapping work. If the same person writes a guide and reviews an article, for example, check whether the schedule allows them to do both.
Read the board
Section titled “Read the board”Here, Review the account setup article is in Review. Separating it from writing work makes the next action clear: review the article. Cards also show assignees, projects, labels, and due dates.
To build this example, see Design your boards and lanes.
Filters
Section titled “Filters”Open Filters in the header to narrow the board by:
- Assignees (OR)
- Ball holders (OR)
- Unassigned tasks only
- Hide completed
- Lane
The My tasks toggle shows tasks assigned to you. You can also search titles and descriptions from the header; press ⌘K to jump to search.