6. Make it stick (the first two weeks)

Tool rollouts usually fail not because a feature is missing but because there is no agreed way of working. Decide the first two weeks in advance.

The goal this week is that none of your team’s work exists outside UTSUROI.

  1. Requests happen somewhere that persists. Not verbally, not in DMs.
  2. Every request gets a due date and a ball holder. “Someone, this week” is not a request.
  3. When in doubt, create it. Duplicates can be archived. Not creating costs more.
  • Elaborate lane design
  • Designing a label taxonomy
  • Looking at analytics

There is no data yet, so analytics will tell you nothing. Design comes in week two, after you have seen where things actually jam.

Once there is data, take ten minutes once a week.

Open Insights → Risks, where stalled tasks collect.

  • Any task with no ball holder? → Nobody’s turn. It is stopped.
  • Any task with no due date? → It cannot be detected as stalled.
  • Any task sitting in one lane for a long time? → That lane is where waiting is produced.

The third one matters most. If items pile up in a specific lane (awaiting review, awaiting approval), that lane is your organization’s synchronization point. That is where the work of lowering your synchronous share happens.

Full procedure: The weekly stall review.

Two things change the picture again:

Symptom Usual cause
Tasks are not being created Requests still flow through DMs and hallways. Slack not connected
Lots of tasks with no due date No habit of deciding a date at request time. Go back to rule 1
Nobody looks at the board Boards are sliced too finely; people cannot find their own work
Notifications are noisy Too many enabled. Go back to overdue-only